The objective of the project was to develop a crawler trolley that would allow the launching of boats built at the shipyard. It’s from a concept proposed by the client that the team of Innovation maritime carried out the structural validation of the handling equipment to be manufactured. This truck was to be able to withstand 300 metric tons, withstand saltwater immersion and had to be easy to insert under a ship under construction.
Partager cet article